国产精品欧美久久久久无广色欲 ,永远电影免费观看日本 ,人人干人人看 ,宽带测速器在线测网速

簡體中文 | ENGLISH

Business areas
The basic business

Second Contract Section of S310 Line Maigaiti-Kashgar Expressway Project Constru

Data:2015-05-29 12:46:28 Hit: Time

    The Maigaiti-Kashgar Expressway starts from Xiyitidun Township in Maigaiti County, passes through Pailou Farm, Regiment 42 of the Third Agricultural Division and enters Yopurga prefecture; it then passes through the Industrial Park of Jiashi County, Xiaputule Township, crosses the Kizilsu River and then enters Akekashi Township in Shule County; it then passes through Yingwusitang Township and Awati Township and then enters Kashgar City, with its destination connected to the Kashgar Belt Expressway. The main line of the expressway is in total 143.011 km long. The construction of this project is of great importance to building the Xinjiang expressway network, facilitating the connection of China’s mainland, Central Asia and Europe and promoting international cooperation.

    The start-end stake no. of the second contract section is k20+000 to k54+000, the total length is 34.104 km and the subgrade width is 28 m. This contract section is designed with one broken chainage, with the stake no. k44+580.188 = k44+475.833.

    The two-way four-lane expressway standard is adopted for the main line of this project.

    Design speed: 120 km/h; common minimum radius of horizontal curve (m): 1000; maximum longitudinal grade (%): 3.0; minimum longitudinal grade length (m): 400; bridge load rating: highway I grade; subgrade width (m): 28; carriageway width (m): full width of main-line carriageway (m): 2 to 2×3.75.


Hot links
News Flash
新疆交通建設(shè)集團官方微博

weibo.com/xinjiangjiaojian
新疆交通建設(shè)集團股份有限公司官方微博和您一起關(guān)注交建發(fā)展。

版權(quán)所有:新疆交通建設(shè)集團股份有限公司 Copyright ? 2014-2015 xjjjjt, Inc. All Rights Reserved.

新ICP備14003397號 技術(shù)支持:路橋網(wǎng)絡(luò)